Updated 28 November 2026
Plug-in solar in the UK
Since 27 August 2026, people in Great Britain can buy and plug in a solar kit of up to 800 W (AC) themselves, without an installer, if the product complies with the government's Plug-in Solar Device Interim Product Specification. You must tell your electricity network operator (DNO). Kits with built-in batteries are not covered.
The rules
- Before: plug-in solar could not legally be sold or used. The wiring rules (ESQCR reg. 22) required generators to meet BS 7671, built for fixed installations, and the British plug standard BS 1363 bans using plugs to connect generators.
- Now: the Plugs and Sockets etc. (Safety) Regulations 1994 allow a BS 1363-style plug for a plug-in microgenerator to be approved if it meets the Interim Product Specification.
- Now: the Electricity Safety, Quality and Continuity Regulations 2002 accept a plug-in microgenerator that meets the Interim Product Specification instead of BS 7671.
- England planning: the permitted development rules were updated on the same day to include plug-in solar, with exclusions (see planning).
- Legal definition: 'maximum rated alternating current output not exceeding 800 watts'. The explanatory memorandum adds panels up to 2,000 W DC. The product specification sets 800 VA maximum apparent power, single-phase.
- Must comply with the Plug-in Solar Device Interim Product Specification v2.0 (DESNZ, 16 July 2026), largely based on Germany's DIN VDE V 0126-95
- Inverter must be type tested to Engineering Recommendation G98 and the device registered by the manufacturer on the ENA Type Test Register; buyers should check the kit is listed as compliant
- Supplied with a BS 1363 13 A plug approved for plug-in microgenerators; plugged directly into a fixed socket
- No extension leads, multi-way adaptors, travel adaptors or RCD adaptors
- PV modules must meet BS EN IEC 61730 fire safety; inverter BS EN IEC 62109
- Not allowed on ACM/MCM or HPL cladding, timber cladding, timber balconies, or buildings under external-wall fire-safety remediation
- Must include a label for the consumer unit (fuse box) and instructions on notifying the DNO
- No third-party certification or professional inspection is required (government decision); compliance is self-declared by the manufacturer and policed by normal product-safety enforcement
- Battery-integrated plug-in kits and plug-in batteries are excluded
- Notify your Distribution Network Operator (find it by postcode via the Energy Networks Association) using the simplified plug-in G98 form, both when you install and when you remove the device. ENA is building a consumer online notification route on its Connect Direct platform. Manufacturers must include a link to instructions.
- England: SI 2026/896 (in force 27 Aug 2026) brings plug-in solar under existing permitted development for houses and flats, but not on wooden walls, balconies, fences, gates or timber-clad walls; not on listed buildings; conservation-area limits for walls/balconies facing a highway.
- Scotland_wales: Set their own planning rules; check locally.
- Source: https://www.legislation.gov.uk/uksi/2026/896/made
Northern Ireland
The wiring/use change (ESQCR) does not extend to Northern Ireland, which has its own Electricity Safety, Quality and Continuity Regulations (Northern Ireland) 2012 and connection rule G98/NI. The product specification says applying it to NI is 'subject to further consideration'. No NI date found as of 28 Nov 2026.
Renting or leasehold?
No legal right to install: renters and leaseholders need permission from the landlord, freeholder or managing agent where the lease or tenancy requires it The product specification makes the user responsible for getting permissions (owner, landlord, freeholder, managing agent), planning permission and listed building consent, and for checking insurance Government says landlords, freeholders and councils should judge requests on their merits; extra guidance for landlords, leaseholders and managed buildings was promised Cladding/timber balcony bans matter for many flats
Sources
- SI 2026/848 (legislation.gov.uk)
- SI 2026/848 PDF
- Explanatory Memorandum to SI 2026/848
- DESNZ Plug-in Solar Device Interim Product Specification v2.0 (July 2026)
- DESNZ plug-in solar consultation and government response (July 2026)
- Government response PDF
- GOV.UK press release, Households can save as plug-in solar panels come to market (26 Aug 2026)
- Ofgem decision on G98 amendment DCRP/MP/26/02 (11 Aug 2026)
- Town and Country Planning (General Permitted Development) (England) (Amendment) Order 2026, SI 2026/896
- Energy Saving Trust plug-in solar checklist